Project Portfolio
Hollywood Aquatic Center
Submitted by Aquatic Design Group
City, State: Las Vegas, Nev.
Cost of Project: $14 million
Type of Facility: Public Recreational and Competitive Aquatic Center
Architectural Firm: Domingo Cambeiro Corporation (DCC) Architects
Aquatic Architect: Aquatic Design Group
Status: Spring 2012
Square Footage: 7,300
Number of Floors: 1
Developed as the county’s second aquatic center, the facility was designed to provide residents a fun and relaxing environment. A huge emphasis was placed on swim instruction programming and competitive swim instruction as well as environmental conservation.
Features include a glass-enclosed, 10-lane competition pool with an instructional pool and party room. An outdoor activity pool features two water slides, a beach-style entry, a lazy river, and interactive water play equipment. The center was also built with the environment in mind using recycled materials.
Las Cruces Regional Aquatic Center
Submitted by Barker Rinker Seacat Architecture
City, State: Las Cruces, N.M.
Cost of Project: $11 million (Phase 1A)
Type of Facility: Recreation and Aquatic Center
Architectural Firm: Barker Rinker Seacat in association with Steve Newby Architects
Status: Phase 1 completed in 2010; Phases 1B and 2 pending funding
Square Footage: 35,000
Number of Floors: 2
Phase 1 of this facility included the lobby, leisure pool, lockers, and core and shell for a fitness center. The tenant subsequently outfitted the fitness center, which is now fully functional. A two-story gallery space anchors the building and is the signature form for the center. Central gathering and circulation space organizes the building and frames spectacular views of adjacent parks and distant mountains while providing convenient access to the building’s numerous functions.
Phase 1B will see the build-out of the gymnasium and community meeting rooms, while construction of a competitive lap pool Phase 2 will round out the aquatic venue. The design brings a contemporary interpretation to New Mexico’s rich architectural vernacular. The project is seeking LEED certification.
Ganesha Park
Submitted by BCI Burke
City, State: Pomona, Calif.
Type of Facility: Park
Architectural Firm: Michael Evans Associates
Status: Completed August 2012
Page 1 of 7 | Next page
Related posts:



