“Over the course of the last year, we have been able to gather critical feedback and buy-in from stakeholders regarding restoration at this park. Incorporating this feedback into the site plans and ultimately into construction will increase the sustainability and support of future restoration work.

“RRF will continue to work … to move forward with Phase 2 of the site-plan implementation. We are in the process of submitting proposals to several grant programs, including the Fund for Lake Michigan and the Wisconsin Coastal Management Program that focus on funding projects that will improve water quality in the Lake Michigan basin.”

Additions For Overall Enjoyment

Each area of the park was analyzed and discussed during several design-team and public-stakeholder meetings. The plan depicts a simplified, connected trail network that leads users to a controlled access point along the river, essentially a “dog beach.”

The dogs will only be able to access the river in this location while other areas are fenced off and allowed to re-vegetate. Dog-friendly, rubberized erosion-control matting is proposed in this area to provide soil stabilization.

Large, outcropping boulders will be added for people to sit on while their dogs are enjoying the river. Native-shrub and tree plantings will be integrated throughout the protected area where feasible to help restore the native riparian habitat.

At the park entrance, a catchment area/gated vestibule will be created to make it easier for users to safely walk their dogs from the parking lot to the dog park. The catchment area will lead users to an open common space that will contain a kiosk with trail maps, volunteer information, and park rules. The open space will also serve as an exercise area for smaller dogs.

The park’s trail system currently consists of loop trails with portions that are quite steep, and have a straight alignment uphill and downhill. As a result, the trails have become eroded from surface-water runoff and foot traffic.

Erosion is a major problem in the park.

The project team has studied the site’s topography and is proposing a redesigned trail network to run parallel with the site contours, with proposed swales and culverts to prevent future erosion.

Kevin Frank, president of ROMP, is pleased with the site-restoration plan and design elements.

“We are excited that we were able to come up with a design that accommodates improvements for the users as well as the environment,” says Frank. “Being able to bring an older park up-to-date with current best practices and general park improvements was important to ROMP.”

The next project steps are to secure funding for design development, engineering, and implementation of the park improvements. The improvements will likely be phased in, starting at the river and working upslope to the rest of the park.

The project team looks forward to completing a site-restoration plan that addresses water quality and streambank erosion issues, and improves this unique experience for the dogs and dog owners who visit Granville Park.

Heather Patti is a professional wetland scientist at R.A. Smith National. Reach her at heather.patti@rasmithnational.com.

Tom Mortensen is a registered landscape architect at R.A. Smith. Reach him at tom.mortensen@rasmithnational.com.

Page 2 of 2 | Previous page

Related posts:

  1. Doggone Checklist
  2. Parks & Playgrounds Q&A
  3. Free To Roam
  4. Rough Rough
  5. Still On The Fence?

Leave a Reply

Your email address will not be published. Required fields are marked *

*

HTML tags are not allowed.

  • Columns
  • Departments