2011 Project Portfolio
- Adventure Golf Services
Facility Name: The Golf Court at Fort Sill
City,State: Fort Sill, Okla.
Cost of Project: $195,000
Type of Facility: Golf Practice/Learning Center
Architectural Firm: Adventure Golf Services
Status: Completed August 2011
Square Footage: 7,200
Number of Floors: 1
The modular golf learning/practice facility was installed on an underutilized tennis court. It includes five driving stations, six contoured chipping stations, two real sand bunkers, a 1,300-square-foot contoured putting green, and open space for training and relaxing. Made from a blend of recycled materials, the project also features 6-foot-high images of golf scenes around the perimeter to create the look and feel of a real golf course.
—————————————————————–
- Aquatic Design Group
Facility Name: “The Cove” Jurupa Valley Aquatic Center
City,State: Riverside, Calif.
Cost of Project: $19.2 million
Aquatics Construction Cost: $2.9 million
Type of Facility: Class 2 Single-Family Aquatic Center (Public)
Lead Architectural Firm: RJM Design Group
Aquatic Architect: Aquatic Design Group
Status: Completed May 2011
Square Footage: 11,000 (building)
Number of Floors: 1
The aquatic center and waterpark features a 25-yard x 35-meter competition pool; a 10,672-square-foot lazy river; a 5,153-square-foot activity pool with zero-depth entry and pirate-themed climbable wet play structure; three waterslides with 1,088-square-foot waterslide receiving pool; a 1,088-square-foot lagoon pool; and a FlowRider body boarding/surfing ride.
—————————————————————–
- Barker Rinker Seacat Architecture
Facility Name: Cottonwood Recreation Center
City,State: Cottonwood, Ariz.
Cost of Project: $15.5 million (including outdoor pool renovation)
Type of Facility: Community Recreation Center
Architectural Firm: Barker Rinker Seacat Architecture
Status: Completed 2010
Square Footage: 53,000
Page 1 of 9 | Next page
Related posts:



